Zhongxiao Gravel Contact Process Facility

  • Key Station: Zhongxiao
  • Pertaining Sewage Collection Area: Zhongxiao Pumping Station
  • Launch Date: March 2014
  • Address: No.2-1, Huanhe S. Rd. Sec.1, Fuxing Li, Wanhua District, Taipei City (Zhongxiao Pumping Station)
  • Design Flow (CMD): 27,000
  • Area (square meters): 9,000

Main Process Facilities Overview

Facility NameQuantityDescription
 
Artificial Coarse Bar Screen
 
 
1
 
 
Fixed, stainless steel
 
 
Artificial Coarse Bar Screen
 
 
1
 
 
Fixed, stainless steel
 
 
Tilting Weir
 
 
1
 
 
Processed steel product
 
 
Intake Pump
 
 
3
 
 
3-ph 380V φ250×5.8m3/min×, 10mH×15kw
 
 
Intake pumping
 
 
2
 
 
3-ph 380V φ300×7.5m3/min×, 10mH×22kw
 
 
Sand Pump
 
 
2
 
 
3-ph 380v φ80×0.2m3/min×10mH×1.5kw
 
 
Roots Blower
 
 
2
 
 
3Ph×380V×30kw×4P×60Hz (40HP)
 
 
Roots Blower
 
 
2
 
 
3-ph 380V 110KW*6P (147HP)
 
 
Roots Blower
 
 
2
 
 
3-ph 380V 75KW*6P (100HP)
 
 
Sludge Pump
 
 
2
 
 
3Ph×380V×1.5kw×2P×F-class×60Hz