Jump to the content zone at the center

How is effluent discharged after treatment at the Dihua, Neihu and Bali Plant?

  1. The Dihua Sewage Treatment Plant uses an effluent pump to deliver the treated water to the effluent well via 2 dia. 1.65m connection pipes (length: 115m each); then discharges the effluent to the Tamsui River via a Dia. 2.5m effluent pipe (length 85m, design flow approx. 1.75m3).
  2. The Neihu Sewage Treatment Plant discharges the effluent to the Keelung River via  a Dia.1.8m pipeline.
  3. The Bali Sewage Treatment Plant discharges the effluent to the Taiwan Straits via a 6,660m effluent pipeline, whose diameters range from 2.4m to 3.6m; design peak flow 21.96CMS; maximum depth of installation is 43m.