- Key Station: Zhongxiao
- Pertaining Sewage Collection Area: Zhongxiao Pumping Station
- Launch Date: March 2014
- Address: No.2-1, Huanhe S. Rd. Sec.1, Fuxing Li, Wanhua District, Taipei City (Zhongxiao Pumping Station)
- Design Flow (CMD): 27,000
- Area (square meters): 9,000
Main Process Facilities Overview
| Facility Name | Quantity | Description |
|---|
| Artificial Coarse Bar Screen | 1 | Fixed, stainless steel |
| Artificial Coarse Bar Screen | 1 | Fixed, stainless steel |
| Tilting Weir | 1 | Processed steel product |
| Intake Pump | 3 | 3-ph 380V φ250×5.8m3/min×, 10mH×15kw |
| Intake pumping | 2 | 3-ph 380V φ300×7.5m3/min×, 10mH×22kw |
| Sand Pump | 2 | 3-ph 380v φ80×0.2m3/min×10mH×1.5kw |
| Roots Blower | 2 | 3Ph×380V×30kw×4P×60Hz (40HP) |
| Roots Blower | 2 | 3-ph 380V 110KW*6P (147HP) |
| Roots Blower | 2 | 3-ph 380V 75KW*6P (100HP) |
| Sludge Pump | 2 | 3Ph×380V×1.5kw×2P×F-class×60Hz |